‘I need to protect my autistic child from wind farms’

June 9, 2014 – Celine Naughton

The parents of autistic children have particular fears about the effects turbines and high voltage pylons may have on their quality of life.

Fears: Neil van Dokkum and his son Ian moved to Kilmacthomas, Co Waterford, in search of a peaceful environment Photo: Patrick Browne

 

Protest: Jenny Spittle wants to protect daughter Billie. Pic: James Flynn

Whenever Jenny Spittle’s children visit their grandad in England, 12-year-old Billie comes home tired, complaining of headaches, earache, dizziness and hearing buzzing noises. Billie has autism and her mother is convinced her symptoms are brought on by the towering pylons and wind turbines located near her grandfather’s house. Now Jenny lies awake at night worrying about plans to build a wind farm close to her home in Co Westmeath.

“I see what she’s like after a week with her grandfather and wonder how she’ll cope if we have these things on our doorstep,” she says.

Like many autistic children, Billie is hyper-sensitive to sound and light. She hears sounds at frequencies that are inaudible to most people, and Jenny is afraid she will find the sound of wind turbines close to home intolerable.

“It’s not easy raising an autistic child, yet while I’m busy trying to organise psychotherapy, speech and language, occupational therapy and all the other kinds of supports she needs to help her cope with everyday life, I also have to make time to protest against pylons and wind turbines,” she says. “I can’t afford to wait until they’ve been built to voice my objections. I have to protect my child.”

Thirteen years ago, university lecturer Neil van Dokkum and his wife Fiona moved from South Africa to an idyllic part of Waterford with their two sons. Their youngest, Ian, had been diagnosed with autism and part of the reason for choosing to make their home in such a remote location was to give Ian the peaceful environment they felt he needed in which to thrive. Then, six months ago, Neil heard about the proposed construction of pylons in the area from a neighbour. The news set off alarm bells for him and his family.

“Ian is incredibly sensitive to electric noise and certain types of light,” he says. “He will start crying and become very agitated. It is a source of emotional trauma for him. My wife and I discovered the extent of this sensitivity when we installed energy-saving light bulbs in our kitchen. When Ian walked in, he put his fingers into his ears, screwed his face up tight and said: ‘Blue light off, please Daddy. Blue light off!’ I was sitting directly under the light and had not noticed anything. Ian was standing at the door, about four metres away, and he couldn’t bear it. Can you imagine how he will be affected by pylons carrying 400kV power lines? Like many other parents of autistic kids and indeed children with other intellectual disabilities, we deliberately moved to the country so as to be away from the city with its high levels of ambient noise, including electrical noise, and disturbance. At night, it can be so quiet here that I can hear the cows crunching grass in the field opposite. Can you imagine how that silence will be shattered by clanking pylons? More specifically, how my son’s silence will be shattered by the electrical noise coming from those cables? How will he be able to sleep with that noise? And how will the rest of my family sleep as Ian becomes highly agitated when awakened by this distressing noise?

“The other concern I have is flight risk. Ian, like many autistic children, has no sense of danger and will run away and on to the road at any opportunity. He is not running away from anything, but sometimes seems to feel the need to rush into an open space. Again, the countryside, with its minimal traffic and quieter roads, is far safer than a city with all those vehicles. Even so, my property is fenced and gated, not to keep people out, but rather to keep my son in and safe.

My deepest fear now is that the electrical noise coming off cables and pylons will disturb him so much that he will attempt to run from it. And if he can’t get out, he will bang his head against the wall out of sheer frustration. The potential consequences are too painful to even contemplate, and if the proposed construction of pylons across the countryside goes ahead, selling our house would be impossible, so we are effectively trapped.

“If the Government were to abandon its slavish adulation of the wind industry and pursue the biomass option, converting Moneypoint power station to biomass boilers, it could save over three billion euro. Imagine how many state-of-the-art facilities for people with intellectual disabilities could be built with that sort of money.”

Department of Health spokesperson says: “According to international literature, no direct health effects have been demonstrated in persons living in close proximity to wind turbines. However, it is agreed that there is a need for additional, well-designed studies in this area. The Department of Health advises that anyone who believes they are experiencing any health problems should consult their GP promptly.”

In its draft development plan, Westmeath County Council required any new wind farm development to implement a setback distance of 10 times the height of the turbine from residential dwellings, but the Department of the Environment intervened. Under Objective PWin6 of the plan, a turbine measuring 180m, for instance, would be sited at least 1.8km away from any house, while according to the Department’s wind energy guidelines, a distance of 500m is deemed sufficient. Minister of State for Planning Jan O’Sullivan wrote to the council instructing it to re-examine the setback distance.

“We received over 5,600 submissions from constituents who supported PWin6, which would have kept the setback distance in place,” says Westmeath County Council chairman Peter Burke. “We informed the Minister of State that we felt the Department’s guidelines were not adequate and she appointed an inspector to carry out an independent review.”

Last month, that inspector’s report recommended against the inclusion of the PWin6 objective on the grounds that it “would be contrary to section 28 of the Planning and Development Act 2000.”

At the time of writing, the Department’s final decision on the matter is pending.

Safety first: Are turbines and pylons dangerous?

Now that Ireland’s plan to export wind energy to Britain has been scrapped, the public has been left a little breathing space to focus on a simple question: Are wind farms and their related pylons and overhead power lines safe or not?

The Department of Health’s Deputy Chief Medical Officer, Dr Colette Bonner, has said that older people, people who suffer from migraine, and others with a sensitivity to low-frequency vibration, are some of those who can be at risk of ‘wind turbine syndrome’.

“These people must be treated appropriately and sensitively as these symptoms can be very debilitating,” she commented in a report to the Department of the Environment last year. We asked Dr Bonner for clarification.

“Presently the World Health Organisation does not classify Wind Turbine Syndrome as a disease under the WHO international classification of diseases,” she said. “Current research in the area suggests that there are no direct health effects of wind turbines. However, there are methodological limitations of many of the studies in this area and more high quality research is recommended.”

Side by side with the controversy over wind farms comes concern over the high voltage pylons which distribute the electricity generated by the wind turbines to the national grid. Chief Medical Officer in the Deptartment of Health, Dr Tony Holohan, has stated that he does not think there is a health risk associated with people living in vicinity of pylons.

But not everybody agrees; according to British physicist Denis Henshaw, people have every reason to be concerned. Emeritus professor of human radiation effects at Bristol University and scientific director of the charity Children with Cancer UK, he recently told a public health meeting in Trim, Co Meath, that high voltage power cables are linked “beyond reasonable doubt” to childhood leukaemia and other diseases.

“It has been shown again and again that there is a definite risk of childhood leukaemia and other diseases near these lines,” he says. “The link is so strong that when a childhood leukaemia occurs near these lines there is a greater than 50pc chance that the leukaemia is due to the line. This raises the prospect of legal action for corporate manslaughter against those involved in putting the line there. The Irish government and EirGrid need to take care of their citizens and acknowledge the known health risks in people near these lines.”

A spokesman for EirGrid says: “We’re not doctors, but having taken advice from experts at the World Health Organisation, along with the chief science adviser and the chief medical officer, it is clear to us that there is no evidence to link overhead lines with adverse health effects.”

The Government report ‘Health Effects of Electromagnetic Fields’ 2007 says: “Given that there is still uncertainty about whether long-term exposure to extremely low frequency magnetic fields could cause childhood leukaemia, use of precautionary measures to lower people’s exposure would therefore appear to be warranted.

“As a precautionary measure, future power lines and power installations should be sited away from heavily populated areas to keep exposures to people low.”

Irish Independent

– See original article at: http://www.independent.ie/life/health-wellbeing/i-need-to-protect-my-autistic-child-from-wind-farms-30336351.html#sthash.J8wQCIQv.dpuf

 

June 6 2014 – Ontario’s Electricity Output

After looking on the IESO website this morning as I sometimes do…I decided to share with my fellow wind warriors the actual output of Wind as of 6am this morning.

With a Wind CAPACITY of 1725MW and only actually using 159MW…we are still paying companies NOT TO PRODUCE! 

This reflects the TINY 1% of our energy being generated by WIND this morning as of 6am!

So let me get this straight, we are PAYING companies NOT TO PRODUCE so that we can have 1% of our energy supplied….

Couldn’t we have made up the 1% through NUCLEAR, HYDRO or GAS???

YES WE CAN!!

 

How much have we WASTED on subsidies for this TINY amount of Energy????

It is going to hurt all of our families for generations to come!

IESO Capacity Chart

 

As of 6am this morning, the total energy make up is 1% WIND…..

IESO Current Chart June 6 2014 6am

 

May 14, 2009 will be a day that will surely go down in Ontario history

alt's avatarHead Wind Ontario

Wolf Island, Ontario

May 14, 2009 will be a day that will surely go down in Ontario history.  As 54 democratically elected Liberal and 5 NDP MPPs voted in favour of the Green Energy Act, a new era of government was ushered in. This huge piece of legislation entailed the opening up and restructuring of 15 existing acts including the Environmental Protection Act, the Environmental Bill of Rights act, and  the Public lands Act.  One must ask why was such a massive and important piece of regressive legislation, that would remove the democratic rights of rural citizens and necessitate the bastardization of existing acts, be pushed through in a matter of days? Our own Auditor General expressed how the Ontario people are “Over-Paying” 2.7 Billion more than the market rate of electricity….how can we sit idly by allowing them to increase our rates to the highest rates anywhere in North America?

As our…

View original post 357 more words

Callous Ontario Liberals ignore wind power’s victims

June 3, 2014 – Sun News – Straight Talk – Jerry Agar

SOUTH KENT WIND FARM NEAR LONDON, ONTARIO Credits: Mike Hensen/The London Free Press/QMI Agenc

 

It is heart wrenching to see and feel the pain of fellow Ontarians breaking down in tears as they explain how the Liberal government drove them from their homes.

But to understand how cold and callous our current political leadership is in this province, you need to experience it.

Rebecca Thompson’s documentary, Down Wind: How Ontario’s Green Dream Turned into a Nightmare (Surge Media Productions), airs on Sun News Wednesday at 8 p.m. and 11 p.m.

It is a story of reckless, agenda-driven politics resulting in shattered lives.

The Ontario Liberal government’s Green Energy Act isn’t just an economic failure; it is an act of brutal indifference to the human cost of politics.

A cost ignored by people living far from the thump of the giant wind turbines, secure in their downtown Toronto homes and politically correct theories; a safe distance from places like Ripley, Clear Creek and Lucknow, Ontario.

Many may not care – worshiping as they do at the altar of so-called green energy – that the jobs promised by the Liberals through their Green Energy Act were never delivered, while the cost of hydro skyrocketed.

But the human cost should matter to us all.

Giant wind turbines, as high as 50 storeys, with blades the size of a 747, were foisted on communities in rural Ontario with no consultation or agreement from the residents, their municipal governments having been stripped of their planning powers by the Green Energy Act.

Unlike politicians who pay lip service to “serving others” while stomping all over people’s lives and looking after themselves, Norma Schmidt spent her life in Underwood, Ontario in the actual service of others as a nurse and instructor of future nurses.

She and her husband spent their lives in the home they lovingly restored over the years; a place they had hoped to share with their grandchildren.

But Norma has been forced out of her home by severe migraines and depression, brought on by the relentless noise and vibration from the industrial wind turbines erected practically in her back yard.

She left both the job and the home she loved, escaping to a room in her daughter’s house.

It is not the life she worked all these years to achieve, and it is not what she deserves.

Do Norma’s tears, and those of others similarly affected, fall to no effect at the feet of Premier Kathleen Wynne?

Norma’s story is one among many, some of them told in Down Wind.

This is the same Dalton McGuinty/Wynne Liberal government that used public money to reward violent aboriginal protesters who seized private property and terrorized people in Caledonia.

That “occupation” continues today and the government, knowing that their voting base in Toronto couldn’t care less about some rubes in the country, keeps the issue quiet by caving into thugs, rather than protecting law-abiding citizens.

Would the government be as forgiving to people across rural Ontario if some were to blow up a few of the industrial wind turbines that have made their lives hell? Of course not.

There are no turbines thumping the night away in Don Valley West or Toronto-Centre.

It remains to be seen whether the people in such ridings, who overwhelmingly voted Liberal in 2011, will care more for their fellow citizens in rural Ontario this time around.

There are any number of political parties to support other than the Liberals.

Renewable Energy Poses Security Risk, New Paper Warns

June 2, 2014 – London

A new paper published today by the Global Warming Policy Foundation warns that intermittent wind and solar energy pose a serious energy security risk and threaten to undermine the reliability of UK electricity generation.

Many people – including ministers, officials and journalists – believe that renewable energy enhances Britain’s energy security by reducing the dependency on fossil fuel imports. The ongoing crisis over the Ukraine and Crimea between Russia and the West has given much attention to this argument.

Written by Philipp Mueller, the paper (UK Energy Security: Myth and Reality) concludes that domestic and global fossil fuel reserves are growing in abundance while open energy markets, despite the conflict in the Ukraine, are enhancing Britain’s energy security significantly.

In contrast, the ability of the grid to absorb intermittent renewable energy becomes increasingly more hazardous with scale.

Germany provides a warning example of its growing green energy insecurity. Last December, both wind and solar power came to an almost complete halt for more than a week. More than 23,000 wind turbines stood still while one million photovoltaic systems failed to generate energy due to a lack of sunshine. For a whole week, conventional power plants had to provide almost all of Germany’s electricity supply.

Germans woke up to the fact that it was the complete failure of renewable energy to deliver that undermined the stability and security of Germany’s electricity system.

“Open energy markets are a much better way to ensure energy security than intermittent generation systems like wind and solar. It would be a huge risk in itself for Britain to go down the same route as Germany and destabilise what is still a reliable UK electricity grid,” said Philipp Mueller.

 

“Unite The Fight” Dinner Another Success!

Lowbanks, Ontario
May 29 2014

DSCN2114

The Mothers Against Wind Turbines hosted another successful dinner and information night in a recent series called “Unite The Fight.” It was held in Haldimand County on the beautiful shores of Lake Erie, at the Lowbanks Community Hall. Great food was served buffet style and the desert table was sinfully tempting.  New faces and the meeting of old friends and supporters as the relentless invasion of wind turbines continues in Ontario.

The night was one of discussion about wind projects and governmental process grievances.  Updates were given on various legal strategies against the unwanted wind projects. A special focus was made about the Niagara Region Wind Corporations proposal to erect 77,  3 MW turbines in a sprawling foot print, that would cover three counties which would include West Lincoln, Wainfleet and Haldimand.  The project has submitted its reports to the Ministry of the Environment for technicalDSCN2112 review and though its reports have
multiple deficiencies, its approval remains a real threat.  Several members of the Mothers Against Wind Turbines working committees made presentations of activities and actions already undertaken and anticipated next steps. The Trees Not Turbines campaign was underway!

Ontario is currently facing Provincial elections and Municipal elections will take place later, in the fall of 2014.  Renewable energy, wind turbines and electricity rates are hot button topics and politicians are being demanded to articulate their party platforms and to work for the people. MAWT and dinner guests heard some words from Marnie Knight a well-known and longtime community activist in the fight against the wind projects. She is now a declared Mayoral candidate for Haldimand and is running in opposition
to the current Mayor, Ken Hewitt.    Notice of the dinner had been sent to multiple candidates and representatives of the local communities. Toby Barrett MPP of Haldimand Norfolk who is seeking re-election in the Provincial elections, stopped by for dinner and accepted hard questions from community members on wind power, including those from Wainfleet Alderman, Betty Konc who was also dining at the event.  Barrett was challenged to speak to a range of issues surrounding the Green Energy Act, FIT contracts
and renewable energy.

Tara Pitts owner of Burnaby Sky Dive a local business  gave a passionate speech and put a human face on the hurtful impacts, unjust planning process and questionable project placements.  She was very honest about how the ongoing legal battle will likely bankrupt her business.  The receDSCN2127ntly released decision was not favourable for the Pitts and surrounding residents. Industrial wind turbines are being located in proximity to their base of operations and are raising legitimate concerns of safety and the future operational parameters of Burnaby Sky Dive.  Wind turbines, aviation and sky divers, these words paint a picture of deadly risk and speak to a clear lack of any planning common sense. The next step in the tortuous legal path will be an appeal in Divisional Court.  She urged everyone present that this was everyone’s fight and to get angry over the injustices and not to be complacent.  A legal battle may have been lost but it isn’t over,  as she said “the fat lady is only humming but she isn’t singing yet.”

Wainfleet Ratepayers Association in partnership with Mothers Against Wind Turbines Inc launched the start of their Raffle with the monies raised to support the ongoing legal costs involving Burnaby Sky Dive opposition  to the wind turbines.   If you are interested in purchasing raffle tickets they will be available at MAWT events now until the draw in September.  Contact the Mothers Against Wind Turbines Inc.  at their website:
mothersagainsturbines.com

The Mothers Against Wind Turbines Inc have many other events in the works, and next up will a booth at Friday the 13th in Port Dover, and Poultry Fest at the end of June.

Thank you to all for your support!

DSCN2116

TONIGHT! Unite the Fight Dinner – May 29, 2014

TONIGHT – Information Night Dinner!

All are welcome:)

We will also be selling White Pine trees for the “Trees Not Turbines” campaign = $3.00 each or 4 for $10! 

Ontario is at a crossroads and unless we get our financial house in order!

The item below was written by one of our very informed and knowledgeable members.  She has given us permission to send it to you.
Ontario is at a crossroads and unless we get our financial house in order we will all be disadvantaged  in the future.  Fiscal responsibility demands that those in charge manage the budget.  Kathleen Wynne and finance minister Charles Sousa have predicted that the Ontario economy will under-perform the Canadian, American and global economies for the next two DECADES!

Consider the performance of the Ontario economy over the last nine years.  The province has been put on notice by Standard and Poor, our credit rating has been downgraded, and we are under a very serious credit watch.  The provincial deficit for this year is $12.5 billion, so this year alone we are spending $12.5 billion more than the provincial government collected from Personal Income Tax        , Sales Tax, Corporations Tax,  Ontario Health Premiums, Education Property Tax, All Other Taxes, Government of Canada transfer payments, Income from Government Business Enterprises and Other Non-Tax Revenue. Our Total Provincial Revenue for 2013 was $114.2 billion. Our provincial debt has more than doubled to $288 billion in the last nine years, and servicing this debt is costing us $11.4 billion this year. Interest payments on our debt are the third largest budget expenditure after health and education.

Over the past nine years more than 300,000 new provincial government employees have been added to the pay roll. Many of these government employees make more than $100,000 per year and are on the Sunshine List. Over 650 new agencies, boards, commissions and entities such as LHIN’s and CCAC’s have been created.

Ontario has a population of 13.5 million people of whom 7.4 million people are in the labour force.  Over one million people are on the provincial government pay roll, paid by the tax payers of this province. It is neither desirable nor healthy to have everyone working for the government. The government bureaucracy has ballooned out of proportion to the size of the population and it is time to CUT FROM THE TOP.  We do not want to remove classroom teachers, nurses, doctors and the people on the front lines, WE NEED THE BUREAUCRATIC FAT TRRIMMED.  We can no longer afford to hire people we do not need, to work in government offices when over half a million Ontarians are now out of work.

We are paying more provincial taxes initiated by the Liberals only to receive fewer services. We now pay HST, health premium (tax), WSIB tax increase, tire tax, electronics tax, eco fees, beer surtax, etc . Yet in health care – eye exams have been delisted, physiotherapy has been delisted, chiropractic care has been delisted, diabetic strips have been delisted. We have an increased wait time for cataract surgery  because Ontario has cut cataract-surgery funding. As the population ages and the supply remains stagnant the wait time for nursing home beds has tripled. So eventually, only the rich will be able to afford health care and nursing homes.

Our manufacturing base is being gutted due to high energy costs. Our energy costs are the highest in North America. We have created an energy surplus since 2006 due to decreased manufacturing and conservation, yet we continue to add renewable energy – wind and solar – to the grid. To maintain a stable grid we pay Quebec and some north-eastern States to take our surplus energy.   The closing of the Gas plants in Oakville and Mississauga will cost the tax payers of this province $1.1 billion. However, this will pale in comparison to the cost of the implementation of the Green Energy Act – a $20 billion price tag for FIT contracts to subsidize renewable energy projects for the next twenty years. Meanwhile, the hydro at Niagara Falls is underutilized and we pay to run a second energy system on “spinning standby” to provide base power when the wind does not blow. The renewable energy subsidies are essential to keep this industry going and this will be the biggest transfer of wealth from the middle class to the corporate elite in the history of Ontario.

Ontario is a have-not province for the first time in Canadian history. Without accountability, transparency, due diligence, and good governance we are being destroyed from within.  We are putting our future at risk and that of our children.   It is critical that we get our financial house in order.

Additional scandals and mishaps reported by Marilyn Taylor over the last 11 years:
ECONOMIC ISSUES
Increased spending by 80% while our economy grew by only 9%
Ranking the lowest of all provinces for fiscal performance
Borrowing more debt than any province except NB
Third highest user of food banks
Job growth across Canada except in Ontario
Prior loss of 60,000 jobs in the horse racing industry
Two ministries under an OPP criminal investigation – ORNGE and gas plant scandals

ENERGY ISSUES
Increased smart meter, electricity, hydro costs
Electricity rates to rise 42% over the next five years
Ontario Power Generation scandal
Task Force on Competitiveness, Productivity and Economic Progress confirmed that McGuinty’s Green Energy Act grossly underestimated the cost to consumers and overestimated the number of new jobs that would be created
Samsung scandal (sole-sourcing
Offshore Wind Turbines scandal
Trillium Wind Power and Sky Power Limited lawsuit (500 million)
Encouraging farmers to build small-scale solar projects but have no way to connect them to the power grid
Kowtowing to green energy lobbies
Ignoring evidence that wind turbines can cause poor health
Caledonia Hydro Line scandal (116 million)
Nanticoke Coal Power Plant Shutdown scandal

HEALTH ISSUES
Emergency room wait times not meeting provincial targets
eHealth scandal (almost 2 billion)
ORNGE scandal (700 million)
Cancer Care Ontario scandal (millions of dollars)
Chemotherapy Dosage scandal
Augusta/Westland lawsuit as it pertains to ORNGE
Ontario Medical Association lawsuits – applied to Superior Court alleging McGuinty not negotiating in “good faith”
Breast Screening scandal (ensuing lawsuits due to thousands of misread mammograms, one life lost)
Public sector employment in health care increased by 39%
Dramatic cuts in health care services in schools
Insufficient senior homecare services
Pharmacy war
Failure to disclose elevated radiation levels
Laid up in US hospital beds as no beds available in Ontario
Hiding hospital errors from the public
Almost 40 C. difficile deaths to date
Loss of 6,500 cancer patient health records
Workers at eHealth suing for not receiving bonuses
Ontarians pleading for their lives or dying because they aren’t getting the health care they need
Patients with certain brain tumor denied help to cover costs of drugs which are covered in Manitoba

ENVIRONMENTAL ISSUES
Eco-Fee Reversal scandal (18 million)
Niagara Falls Commission scandal
Voting to cover up the Niagara Parks Commission scandal
Cement company lawsuit (275 million) – Quarry outside Hamilton was scuttled for political reasons
Illegal green taxes

EDUCATIONAL ISSUES
Education minister signing off on documents that she doesn’t even read
Public sector employment in education increased by 34% while student population decreases
Failing grade on ADHD education
Foreign Scholarships scandal (our students pay the highest tuition in Canada while foreign students get free university educations)
School bus service lawsuit
Increased  tuition costs

NORTH ISSUES
Ring of Fire
Ontario Northland Railway scandal (820 million)
Failing grade in northern forestry management

TRANSPORTATION ISSUES
Auto Insurance scandal
Increased car insurance costs
Imposing blood alcohol rules that punish people who are not impaired
Presto

CHILDREN’S ISSUES
Failing grade of Family Responsibility Office
Children’s Aid Society scandal
Class-action lawsuit for autism funding cancellation

PROPERTY ISSUES
MPAC scandal (over and under-valuation of properties)
Highest rent increase rate in years

SECURITY ISSUES
G20 Secretly Approved Police Power scandal
Refusing public inquiry into G20 fiasco
Talked about a two-year freeze on wages for public sector while previously giving the OPP a 5% wage increase – the OPP received another raise of over 8% in January, 2014
McGuinty defunded the Centre for Forensic Sciences throwing a world-renowned police team who specialized in retrieving deleted computer files out of work two months before he resigned

GENERAL ISSUES
Millions spent to needlessly redesign our provincial logo
Lobbyist scandal (two multi-million dollar scandals)
Slush Fund scandal (32 million)
Elliot Lake Collapse lawsuits (two lives lost due to recovery delays)
Public sector employment in social services increased by 39%
Pan Am scandal (cost increase from 1.4 to 2.5 billion)
Payout for Pan Am CEO (250 million)
OLG scandal (millions of dollars)
Millions spent to remove the “C” from OLG when Ontario Lottery & Gaming Corporation was changed to Ontario Lottery & Gaming
Tax collectors getting 45,000.00 severance packages for switching job titles from provincial to federal
OES missed its collection and recycling targets by 59%
Not correcting the foreign ownership of our beer market
Acceptance of garbage striker extortion
Harassing labour inspectors
Abstained from vote to investigate CBC expenses
Cash kickback scheme involving government cleaning contracts that ended with the conviction of Liberal officials
Giving those who hire only newcomers a $10,000.00 tax credit
Legal rights of Ontarians disregarded relative to the Caledonia-Mohawk matter

More to come….
Like I said, Ontario is a have-not province for the first time in Canadian history. Without accountability, transparency, due diligence, and good governance we are being destroyed from within.  We are putting our future at risk and that of our children.   It is critical that we get our financial house in order.

A very concerned citizen

CM
The opinions expressed here are those of the author and do not necessarily represent Mothers Against Wind Turbines Inc. policy.

Explosive Letter From UNESCO Warns Dorset Wind Farm Could Compromise World Heritage Status

Donna Quixote's avatarQuixotes Last Stand

  • Proposed wind farm would place 194 turbines off the Jurassic Coast
  • Letter warns turbines will obscure view of the Isle of Wight
  • UNESCO review found project would have a ‘significant impact’ on the site

UNESCO has warned that plans for a wind farm of Dorset’s Jurassic Coast could compromise its status as a World Heritage Site.

The organisation has waded into the row over a controversial wind farm, writing an explosive letter to Whitehall outlining serious concerns about the project.

UNESCO also stressed that Britain could be in breach of the World Heritage Convention, which dictates that individual countries have a duty to ensure the ‘identification, protection, conservation and presentation’ of their World Heritage Site.

The director of UNESCO ends the letter by urging the relevant authorities to take the comments into account when deciding to grant the wind farm permission.

While it wasn’t outlined in the letter, some experts…

View original post 106 more words

Protecting our children from Industrial Wind Power Emissions is our first priority!