Category Archives: Green Energy

Lowbank Rebel

This slideshow requires JavaScript.

Scandal! EirGrid in the Crosshairs

~What happens when decisions concerning build out of electricity generation infrastructure has already been decided and public consultation done just for show?

~What happens when new extensions of the grid appear linked to facilitate the rapid and contested build of industrial wind turbines while ignoring cumulative environmental impacts

Members of the RTS Substation Action Group in Ireland  are taking action to protect their communities and have exposed the involvement of  EirGrid.  A huge substation is planned capable of accepting multiple wind facilities to the Irish electrical grid.   A substation that if built could impact clean drinking water for well over 8 000.   

eirgrid-crosshairs1.jpg

Ratheniska residents are claiming that they have exposed Eirgrid’s litany of failures and systematic corporate sharp practice. 

The Ratheniska, Timahoe, Spink (RTS) Action Group, when briefing Minister Denis Naughten, made a number of extremely serious allegations, which they backed up with a dossier of painstakingly accumulated evidence: 20170118 – Presentation to Ministers-For Issue

Aside from the long standing issues of site unsuitability, water source destruction and planning process corruption, the RTS Action Group claimed to have unearthed very serious transgressions by Eirgrid’s board of the code of practice for semi state bodies.

The evidence indicated that EirGrid had created “a short cut on the board“.  RTS Action Group explained that four members on the EirGrid Board had formed a “sub-board” and were “filtering information going to the board where they are now rubber stamping projects and funding on the basis of recommendation by this four member sub – board.”

If these allegations prove to be true, and the RTS Action Group are adamant that they are, then this constitutes an extremely serious breach of the code of practice, which should lead to a mass resignation of the EirGrid Board of Directors.

In a statement released after the meeting with the Minister, the RTS Group said:

“The RTS Group believe that Minister Naughten, who was accompanied to meet the delegation by his Cabinet colleague and local TD, Charlie Flanagan, had his eyes opened and was astonished by the import, nature, scope, scale and seriousness of the information being placed before him, for the first time.

This meeting arose from a promise made last June in the Dáil by Minister Naughten to visit the site of Eirgrid’s “unauthorised development” and the community who alerted the authorities to Eirgrid’s illegal building activities.

Our greatest concern is that the construction of Eirgrid’s unnecessary energy hub project will destroy and pollute the very necessary and only source of clean water for not just this community but for 8,000 Laois people. All of the evidence of how Eirgrid have conducted themselves up to now points to this eventuality, and we just can’t allow that to happen.
The political fallout from this semi-state operating with such a cavalier attitude to planning law, sustainable development, professional best practice, and corporate responsibility was that all three local TD’s and all Laois County Councillors were unanimous in calling for Eirgrid to cease the development.

We set out some of the evidence for the Ministers as to how Eirgrid have been deliberately deceiving us, the planning authorities, the other arms of state, and even the Dáil from the very outset of this ill-conceived project. This is not due to a few mistakes, or a few individuals making errors, but systematic deception through every phase of this development from its inception to illegal commencement. This evidence has been collected through in depth research and forensic examination. The community could not rely on what Eirgrid were telling us in the public domain throughout their sham consultation process. This damning dossier has been given to Minister Naughten, who as line Minister is ultimately responsible for Eirgrid, their conduct and corporate transparency and accountability.

The buck stops with him. He is now in full knowledge of the scale and scope of Eirgrid’s deception and disgraceful behaviour, we expect the Minister to reel Eirgrid in, to finally make them accountable for their actions on site and in their boardroom. He must move to scrap the project. On foot of today’s new revelations it is incumbent on the Minster to act, act promptly and decisively”.

The last word goes to the current Minister of Justice, who made the following statement after being briefed by the RTS Group:

“There has been a clear breach of law. The breach is sufficiently serious to abandon the project. I don’t believe there is any way back for EirGrid. They should pack up their machinery and should not come back.”

Source: The Law is My Oyster

Ontario Environment Ministry Sued

White Pines ERT & The People vs IESO & WPD

A call to action!

Your presence is requested in the seats at the upcoming Environmental Review Tribunal hearing against White Pines Wind and circumstances surrounding the IESO contract for the renewable energy approval.

Upcoming Court and ERT dates/times/locations:

APPEC legal action against the Independent Electricity System Operator (IESO) and WPD White Pines Wind Inc. will be heard on January 29, 2018 at the Belleville Court House starting at 2:00 pm.

Additionally, the hearing dates for the APPEC appeal to the Environmental Review Tribunal (ERT) have been confirmed as follows:

Pre-hearing Conference
January 24, 2018 at 10:30 a.m. at the Sophiasburgh Town Hall, 2771 County Road 5, Demorestville.

The purpose of the Pre-hearing Conference is for interested persons who would like speak at the hearing to apply for status either as a Party, a Participant or a Presenter. Please click here if you are interested in finding out more about seeking status at the hearing and click here to view the ERT Notice of Pre-Hearing Conference.

ERT Main Hearing
February 12, 2018 at 10:30 a.m. at the Sophiasburgh Town Hall.

The most effective way of showing the Superior Court and the Tribunal of the level of community concern with the White Pines wind project is with your presence.

Source: Alliance to Protect Prince Edward County

*To confirm dates and venue locations for any changes please contact the Environmental Review Tribunal *

This slideshow requires JavaScript.

Turbine collapse in Chatham Kent

chatham kent turbine 2018
A collapsed wind turbine in Chatham-Kent is renewing calls for wind projects to be stopped. (Monte McNaughton/Twitter)

Turbine snaps in half in Chatham-Kent, MPP calls for halt of wind projects

‘The blade is wrapped around the bottom of it and the engine is on the ground’

By Dan Taekema, CBC News Posted: Jan 19, 2018

A wind turbine in Chatham-Kent, Ont. has snapped in half, leading to calls from one area MPP to halt area wind projects.

The turbine in Raleigh Township, near the corner of Drake Road and the 16th Line, collapsed on itself Friday.

“As we were getting closer you could see in the distance that it was snapped in half .. it’s actually one of those ‘Oh my goodness [moments],” said Chatham-Kent Ward 2 councillor Karen Herman. “I was so surprised to see something like this. The blade is wrapped around the bottom of it and the engine is on the ground.”

No injuries reported

The Turbine is owned by TerraForm Power. The company confirmed one of its turbines collapsed Friday and that crews are investigating the cause.

“The issue did not cause any injuries or impact to the broader community,” wrote spokesperson Chad Reed in a statement emailed to CBC News.

Chatham-Kent’s Fire and Paramedic Chief Bob Crawford said the turbine has been disconnected from the grid.

“With safety being a priority, workers are currently putting up safety fencing around the broken turbine and Chatham-Kent Police are also present,” he added.

Lambton-Kent-Middlesex MPP Monte McNaughton shared a photo of the mangled turbine on Twitter and used it as an opportunity to renew calls to stop two upcoming wind projects in the area.

“The Liberal government should put a halt to the Otter Creek and North Kent projects immediately, put a moratorium on them so we can look into the safety issues of turbines,” he explained.

 

read rest of  article

Wind and water, right and wrong

Right-Wrong

The Chatham Voice|January 15, 2018| Letter to Editor

Sir: This wind-water issue in north Chatham-Kent has been dragging on – it seems like – forever. Is it just me, or does it feel like there is a lot of crap going on around the issue that is successfully distracting people from a real and serious issue. The ‘crap’ I am referring to is the politics (of wind power), the personalities (of Randy Hope and Kevin Jakubec) and the lame excuses getting in the way of meaningful action.

First is the excuse that the windmill projects are not to blame for the water quality issues. The only thing I can say to that is to please stop insulting our intelligence! It is NOT a coincidence that these wells, which have produced clean water for years and years, suddenly and en masse became spoiled at the same time that the construction of these mega-project windmills started.

The second excuse is the sediment in the water, and whether it should be tested, how it should be tested, and whether it is harmful to human health. My answer to this is quite simple: if you don’t know for sure, err on the safe side. Test it for everything you can, and if there are potential risks that exist, consider them real.

Mayor Hope wants to argue that the residents are not drinking the sediment, but perhaps he was sleeping through the science class that taught us sediment is made up of particles ranging in size from those you can see to microscopic ones that are essentially dissolved and part of the solution that can pass through filters and be consumed.

What if 20 years down the road it is found out that the black shale sediment in these wells is the root cause of widespread health issues among the rural population in these wind turbine areas? Is council blessed with some crystal ball that allows them to foresee the future? Is council willing to take the risk of being wrong? Do they want that on their conscience?

Behind all this smoke and mirrors is a real issue about water, and the rights we all have to water. More importantly, and what should concern every citizen in C-K, is the obvious and deliberate disregard our elected leadership in Chatham-Kent has towards this right. Those council members that are not giving their all to defend the water rights of those citizens in Dover and Chatham Townships are the same members that the rest of us across C-K are going to be counting on to look after our best interests when/if our need arises, whatever that need may be. How does that make you feel? How much confidence do you have that they will do the “right thing” when your time arises?

Here is the bottom-line: Water security is a principle where no exception should be made and no ground be given. It’s one of those hills that are worth dying for and something community leaders are elected to valiantly protect. We cannot let these wind companies walk away making millions off C-K’s wind resources and leave behind a trail of spoiled wells and plastic water tanks. If they are going to leave here and benefit from C-K for years to come, the least they can do is leave CK the way they found it!

We should all be paying attention and contacting our local councillors, demanding that they do their job, do the right thing and stand up for the basic rights of their fellow C-K citizens. This is not about wind any longer, it is about water – a basic human requirement and right! And we should be judging our elected leaders by their actions on this important community issue. Municipal elections are less than a year away – let’s hope this issue has a solution in-principle by then.

Rick Youlton

Chatham, Ontario

New Year & No Relief for families impacted by North Kent Wind

The Chatham Voice|January 10, 2018

Water tanks freeze up

The new year isn’t bringing any hope for a better situation for 12 families issued water tanks in the North Kent 1 Wind Farm project (NKW1) area north of Chatham.

The recent unseasonably cold weather resulted in water in the tanks and lines being frozen solid, according to Water Wells First (WWF) spokesperson Kevin Jakubec.

At a press conference last week at the home of Jessica and Paul Brooks on Brook Line, the family shared their continued frustration with the lack of action by the wind farm company and the Ministry of the Environment and Climate Change to fix their well, which was contaminated with black sediment back in the summer.

“This morning (Jan. 5) the Brooks family at 9597 Brook Line woke once again without water,” Jakubec said. “It was July 29 when they filed their complaint with the MOECC and the report showed their well had 30 times the turbidity of their baseline testing results before NKW1 started pile driving. They met the burden of proof of contamination.”

“Earlier in the week, the water was frozen solid inside the water tank supplied by Samsung & Pattern. The water tank was part of a requirement on the developers in the North Kent Wind REA Permit issued by the MOECC requiring that water tanks be installed when any impacts occurred to a water well.”

Jakubec said his group, Water Wells First, advocated for months and incurred substantial legal costs to see that measure was put in place to protect families in case their wells experienced the same sediment and flow reduction that happened in the former Dover township.

While the bitter cold hasn’t helped, Jakubec asked why Samsung and Pattern Energy aren’t providing a practical water source for the affected families in this extreme cold, and why are 12 families still on water tanks six months later?

Also, a big question Jakubec said is what has the MOECC been doing to find practical solutions to the loss of so many wells in such a short amount of time in Chatham township and where are the reports they have been promising for months that look at conflicting results from well testing AECOM has done on the affected wells and MOECC testing on the same well?

Spokespersons for the MOECC have said previously they are still working on the report but give no firm timeline and when it will be released.

The lack of action by the province to find out how and why the groundwater is contaminated is also a source of frustration for WWF members.

“This is highly unusual. Brownfields and industrial sites that have contaminated the groundwater beneath them have to go through extensive clean up measures or face severe court fines by the MOECC,” Jakubec noted. “Why does the MOECC not impose those requirements on Samsung and Pattern, the developers of the North Kent Wind farm?”….

Read rest of article

Zoo Poo & other important connections

zoo poo
Zoo poo and food waste to fuel 500-kilowatt plant

Important connections in the world of energy in Ontario

Credit: Parker Gallant Energy Perspectives

Reading an article recently about Greenpeace trying (apparently unsuccessfully) to create a solar-powered town in India several years ago reminded me of a project in the GTA proposing to use “zoo poo” to create a 500-kW biogas plant.

The project is a co-op known as Zoo Share Biogas Co-operative and plans to use methane from animal waste to produce electricity in a biogas plant. The chatter about this project goes back to June 3, 2011 and those behind the project applied for a contract with the OPA (since merged with IESO).

So where is it now? A visit to the website shows the OPA advised them early July 2013 they were granted the contract. A PDF file titled “Construction Plan Report” on the site reveals “Construction of the facility is scheduled for summer 2014 with completion and grid connection expected in the fall of 2014.”

Needless to say, the plant is still not functioning but nevertheless has taxpayer support and some $4 million raised from individuals and others who purchased bonds that carry a 7% coupon on a project estimated originally to cost $4.8 million.

Curiosity further led me to look at the members of the Co-op’s Board of Directors and I noted Chris Benedetti was a Board member.  Benedetti is a principal with the Sussex Strategy Group and the head of its Energy and Environment Practice.  Some will recall Mr. Benedetti was involved in a major fundraising event for the Ontario Liberal Party as reported in an article in the Globe and Mail in March 2016 headlined:  “For $6,000, donors get face time with Kathleen Wynne and Bob Chiarelli”.

That article contained the following attributed to Mr Benedetti: “The evening is being promoted by Sussex Strategy Group, one of the country’s top lobbying firms. In an e-mail encouraging energy industry insiders to attend, Sussex principal Chris Benedetti wrote that the soirée will be a ‘small event with a limited number of tickets,’ giving all attendees face time with Ms. Wynne and Mr. Chiarelli.”

Previously, the Sussex Strategy Group’s name was connected with what the Toronto Star noted in a November 2010 headline as:  “Group plans to ‘dupe’ public about green energy costs: Tories”.  The article also noted: “The Oct. 18 document, drafted by consulting firm Sussex Strategy Group, lays out a plan — complete with a $300,000 initial budget — to change the channel on the current green energy debate, which is largely focused on cost.”

The Benedetti/Sussex connection led me to visit the Sussex website; the page titled “Our People” shows Kim Warren’s name and picture of Kim Warren under Sussex’s “Affiliates.”. Mr. Warren was, until January 1, 2017, the COO of IESO; if you check the “Sunshine List” for the 2015 year you will note he was paid $577,000.04 — not too shabby for a public servant!  When he was employed at IESO he spoke about integrating renewable energy. Due to his positive tone the short video of his speech was posted on the CanWEA website; he was clearly supportive and claimed wind energy “was a big part” of shutting down coal.  (Many grid operators around the world would dispute his claim.)

Searching on Google again using Mr. Warren’s name and his IESO affiliation turns up other relationships.  One that pops up is NRStor:  a press release dated June 20, 2017 announces he is the newest addition to NRStor’s Board as a Director and states:  “The insights and experience Kim Warren brings to our board as previous COO of the IESO is significant,” said Annette Verschuren, NRStor’s Chair and CEO. “He is a world expert on power systems and his extensive understanding of the electricity market will help NRStor grow and develop our energy storage business.”

Coincidentially, NRStor has been awarded contracts by IESO with the first one on July 22, 2014 announced by then Energy Minister, Bob Chiarelli: “Today, the Minister of Energy, the Honourable Bob Chiarelli, announced the commencement of commercial operations for NRStor Incorporated’s (NRStor) 2 megawatt (MW) Temporal Power Limited (Temporal Power) flywheel energy storage facility in Harriston, Ontario.”   Now assuming the 2MW of storage was called on to replace Ontario’s generated power it would be capable of supplying demand for half a second, or less.

The second contract awarded to NRStor by IESO noted:  “NRStor will build a fuel-free compressed air energy storage facility that will provide 7 MWh of storage capacity to the IESO.”

For those who wonder who is NRStor, the following comes from their website: “NRStor is a market leader in understanding energy storage technologies, their costs, and the benefits they can provide customers across the energy supply chain. As a project developer, we develop, own and operate industry-leading energy storage projects in partnership with progressive stakeholders and leading technology providers.”

NRStor was founded by Ms. Annette Verschuren, former CEO of Home Depot. Ms. Verschuren spoke to the Standing Committee on Finance and Economic Affairs May 19, 2015 in respect to Bill 91, Building Ontario Up Act. One of the notable comments she made was,  We are a developer of energy storage technology, so we build projects. We are working on about 20 projects at the moment and we see the introduction of energy storage really making a big difference in terms of how we get electricity to market in a cheaper way. NRStor recently announced a partnership with the Tesla Powerwall, which is very exciting, to be introduced. We want to start in Ontario. We see that movement towards, again, using excess energy to improve costs and make it easier for customers.”

Ms. Verschuren also offered her “Congratulations to the Ontario government for its announcement on cap-and-trade policy.” and: “The privatization of Hydro One is also something that I’m very supportive of.”

While Ms. Verchuren is very accomplished and informed, from my perspective, she has missed the effects on hundreds of thousands of Ontario ratepayers/taxpayers from the Green Energy Act, and the “cap and trade” tax.    Ontario’s “excess energy,” as she puts it, represent a huge cost to ratepayers, which seems to have escaped her thinking.

The conflict in Ms Verchuren’s testimony is exacerbated by adding Kim Warren as a Director of NRStor.   The fact that NRStor has benefited from IESO’s contract awards should have triggered the question of how the media and public would view his appointment.   As a director he would be required to be a shareholder in NRStor which seems to fly in the face of IESO’s “Post-Service Restrictions” contained in their Code of Conductwhich states: “It is expected that the restriction against purchasing or holding any Prohibited Financial Interests continues until 6 months following the end of your employment or association with the IESO.”

Worth noting is Ms. Verchuren is registered as a lobbyist with the Office of the Integrity Commissioner as is Chris Benedetti (lobbyist for NRStor and 55 other companies), but Kim Warren is not.

The Ontario Ministry of Energy seems to have created a tangled web that benefits select companies and individuals.

Parker Gallant,

January 7, 2018

 

Cherish Your Suffering

Rex Murphy: Cherish your suffering, Ontario; Premier Wynne’s green gods know of your sacrifice

Those outside the faith, and mere loitering agnostics, see nothing here but a catalogue of burdens. Shackles of an alien god. But to those within the covenant, they are the way stations on the hard and stony path to delicious rewards reserved for the elect.

National Post| January 6th, 2018|Rex Murphy

TS20161220CR20
Premier Kathleen Wynne

It cannot have escaped the attention of many that Ontario is most unsettled these days. That its industries are anxious, its debt colossal, its citizens not in a pleasant mood. Ontario is in a lot of pain. But let me assure readers outside Ontario that it has not all been for nothing. There are rewards. They are subtle, intangible, but they are real. Let me explain.

Those who share the faith and endorse the morality of global warming derive very much the same satisfactions that attended fidelity to the less demanding dogmas of earlier and less ambitious creeds. The carbon regime, tax hikes on gasoline, failed or failing long-term contracts, fear and trembling in the manufacturing sector, the gnashing of teeth in poorer (and now colder) households, Ontario Hydro’s ever-swelling levies, the despoliation of rural vistas by towers of whirling, bird-bashing windmills: These, each in itself, and all in combination are the acknowledged costs of the Great Greening.

Those outside the faith, and mere loitering agnostics, see nothing here but a catalogue of burdens. Shackles of an alien god. But to those within the covenant, they are the way stations on the hard and stony path to delicious rewards reserved for the elect. This is the true chemistry of belief. What appear as obstacles to heretics, appear to believers as smooth escalators to a higher state. Accepting, embracing what must be done supplies them with a sense of inner sanction, endows them with that peace of mind which a lesser scripture records, rather churlishly, as passing all understanding……

Read article

Big Wind Story