Witness Tampering Allegations made for Hearing of Wind Turbine Safety Hazard for Aviation

TORONTO – Ontario’s Liberal government denies Opposition charges that it interfered with the witness list for a hearing into a plan to install at least six, 152-metre-high wind turbines near the Collingwood airport.

Progressive Conservative house leader Jim Wilson says the province decided at the last minute to call a witness from NAVCanada instead of an expert from Transport Canada at an Environmental Review Tribunal hearing.

NAVCanada is a private corporation that owns and operates the country’s civil air navigation service, while Transport Canada is the federal government department responsible for transportation policies and programs.

Wilson says the witnesses were changed because Transport Canada has concerns about putting industrial wind turbines between the Collingwood Regional Airport and the Stayner aerodrome.

He says the Ontario government refuses to acknowledge that putting giant turbines so close to the small airports pose a hazard to aircraft operations.

But Environment Minister Glen Murray says it would be against the law for him to play any role in determining witnesses or influencing the environmental tribunal.

READ MORE:  http://www.winnipegfreepress.com/arts-and-life/life/greenpage/liberal-deny-tampering-with-witnesses-at-hearing-into-wind-turbines-near-airport-394837381.html

2 thoughts on “Witness Tampering Allegations made for Hearing of Wind Turbine Safety Hazard for Aviation”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s