Report on the ERT Hearing on the White Pines Wind Project – Nov. 12, 2015
By Henri Garand and Paula Peel, APPEC

The Environmental Review Tribunal (ERT) of the White Pines wind project devoted Day Five to hearing six members of the public previously awarded status as Presenters rather than expert witnesses.

Christopher Currie also sought to be qualified as an expert witness because he would be commenting, as a professional land use planner, on WPD’s application reports. But the Tribunal denied the request because Currie’s focus was on water bodies and he has no credentials in hydrology or related subjects.

As a Presenter, nonetheless, Currie gave a detailed review of the deficiencies in WPD’s assessment of water bodies on the project site. He pointed out that two fisheries biologists, not hydrologists, had carried out all the field work from June to mid-October, never during the wet season of November through April, and had used assessment standards inappropriate for alvar.  Due to these and other numerous flaws in methodology, the final report was incomplete and unreliable. Excavation, drilling, and hydrofracking for wind turbine bases would cause serious environmental harm to animals and plants by permanently altering the South Shore watershed.

Cheryl Anderson, president of Prince Edward Point Bird Observatory (PEPtBO), described how White Pines would jeopardize the millions of birds which migrate each year through the Prince Edward County South Shore Important Bird Area (PECSSIBA). Soaring birds like eagles, hawks and vultures are especially vulnerable, and a dozen species at risk breed in the project area.  Moreover, PECSSIBA, which is globally significant for waterfowl and nationally significant for endangered bird species, meets all Environment Canada criteria for a location unsuitable for wind development. In light of high mortality at the nearby Wolfe Island wind project, Anderson called on the ERT to apply the Precautionary Principle.

read more: https://appec.wordpress.com/2015/11/13/white-pines-wind-project-ert-hearing-november-12-2015/

One thought on “White Pines Wind Project ERT Hearing – November 12, 2015”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s