Wind weasels deny all the problems that they cause, because they don’t want to be held accountable!
****
In our post “The Breakout” we talked about just how sick and tired we all are of crippling wind power driven electricity prices, how those unfortunates stuck with giant fans are sick and constantly tired as a result of incessant and debilitating low-frequency turbine noise – and how the world is growing tired of the nauseating stream of a wind weasel corruption, lies and deceit.
Adverse interference with water tables is just another “wonderful” feature of eco-friendly giant fans. The largest fans require a steel reinforced concrete base of around 400 m³.
The base itself – depending on the rock strata – for 3MW turbines will be set up to 30 m below the surface and – if the soil is unstable and rock anchors are required – reinforced concrete pillars are drilled up to 90 m below the surface and literally screwed into the rock strata. …
View original post 995 more words